Storage charges

8/14/17       
Harold

Website: http://morantzcabinets.com

In the past two years we have been doing whole houses of cabinetry for a developer that has been keeping us very busy, large kitchen, butlers pantry, 5-6 vanities, laundry room, all closets and home offices, mostly high gloss our textured melamines with some painted shakers as well, new builds and from 35-90k per house, we do the design work and drawings and get 50% deposit and payments as we progress with 75% paid before we install. At times there may be two or three homes at once finishing weeks apart, we produce as soon as we get deposit and install in stages depending on when finished floors go in. We sometimes can be sitting on a whole house of finished cabinetry for a few weeks. We have rented a 1400sqft warehouse to keep everything as we only have a 3600sqft shop, is it standard to charge for this storage in any way? When they are ready, we can start installing and are always on time, this space is integral to being able to handle these orders. All opinions welcome. Harold.

8/15/17       #2: Storage charges ...
Charles Member

Here are my thoughts.

From the buyer's perspective (developer), it messes with the numbers if the total cost of the cabinetry keeps changing. Sometimes he may be able to control the schedule. Sometimes not (e.g., weather, subcontractor availability, etc.). Varying the costs introduces uncertainty into his financial plan.

As a buyer of materials for my business, I want a fixed price as well. I do not want any unnecessary uncertainty in the Cost Of Goods Sold (COGS). I really do not care if my suppliers need to rent extra space to store their materials before they ship them to me. That is their issue, not mine.

Yes, I understand that you are making a custom product, not a commodity. I do order a number of custom items for my end product. How those vendors store them before they ship is of no concern to me. I understand there is one difference here. Typically they ship as soon as the product is ready. Occasionally I have asked to delay shipment and no extra charges have been applied.

Yes, I have clients who delay my delivery schedule for one reason or another. Sometimes the delay is days. Sometimes weeks. Sometimes months. Fortunately the very long delays I have known about ahead of time and simply adjusted the Production Schedule to avoid having finished goods sit around for the many months. I do not charge any storage fees, or schedule change fees, to the client.

I would suggest you consider simply building in the extra storage cost as part of your overhead; for every project. Whether or not that results in a price increase to your customer is up to you.

If there is an unusually long storage issue with a particular project (possibly storing a large quantity of completed goods many months or more???), then maybe you could address that particular client as needed on a case-by-case basis. But, I would think having the extra storage space is simply part of your cost of running an efficient business that enables you to deliver whole houses just weeks apart, and realize a healthy reputation and profit because of it.

One of the key goals in my business marketing plan is to make the Sales Process as pleasant and easy as possible. Introducing varying charges that will be dependent on unknown future schedules, that have a reputation for changing, does not meet that goal.

Congrats on having such an issue of so much work. Wishing you continued success here in FL.

8/15/17       #3: Storage charges ...
Adam

Regardless of how you are being reimbursed this obvious overhead needs to be paid...not absorbed.

At this stage you should be able to educated guess how long each project sits in storage. I would go by the week. You could either line item it in your initial quote, simply add it to your blind contract price, or bill it as an extra.

Most builders would rather not see it. So bury it in the contract. Its a legit cost, so don't feel bad about it.

8/15/17       #4: Storage charges ...
Harold

Website: http://morantzcabinets.com

Thanks guys, that's the way I was looking at it as well and I have been putting an extra amount on my costings to account for it, I agree that the developer is not interested in seeing additional charges and it is not his concern, up until two years ago, our projects were smaller and direct to the consumer for smaller residential jobs and these large projects are way more profitable with preselected colors and designs done quickly and no consumer angst over each project. Just wondering if others do add any charges, but your opinion has confirmed my thoughts. Harold

8/15/17       #5: Storage charges ...
JM

Harold,
Your business sounds similar to mine....builders buying whole house packages. We run into the same issue with storage.

In my opinion, a delay of a couple of weeks should already be factored into your pricing. This is construction, and timing can be shifted due to weather, labour or material shortages, etc. Storage around typical construction timing should be factored into your cost.

Now if the builder tells you he needs to put a project on hold for 8 months, that is a different story. Its worth having the conversation to get storage costs, but I would doubt you will get any money out of them.

8/15/17       #6: Storage charges ...
Gary B.

All good thoughts above. Have you considered a Just in time model to make the parts and store them, then assemble within a week or so of it going out the door? This would save a ton of space.

The trouble with schedules is that they are really best intentions. There are so many variables that we as cabinet makers cannot control. The further out you're trying to plan, the more likely you're off by some margin of error. But, the GC should know this week if he actually needs cabinets on the site next week.

I realize this approach may not work for everyone, but those that can make it work, (such as those building frameless modular boxes) would certainly see a benefit.

8/15/17       #7: Storage charges ...
Family Man

I've always looked at storing cabinets as the lesser of two evils. The other evil of course is not having enough build time in a busy schedule- either by their doing or yours. Storing them is by far the better, and more profitable in the long run, option. Build it and move on. If you have the climate and budget move them directly into delivery trailers or box trucks to keep from having to to move them/load them more than once. Which saves on labor and damage from the occassional ding. Wrapped in stretch wrap,inside a trailer, for only several weeks cabinets will hold up great.

8/15/17       #8: Storage charges ...
David R Sochar Member

If your customer is a reasonable man, talk to him. Let him know you are allowing a recovery for storage costs to creep into your pricing, not so much as to get rich, but to stay in place so when he - the customer - calls again, you will be there. He is a businessman and understands that for certain.

Do allow those costs to be recovered, and more for the hassle of moving, rescheduling, and even the stress of juggling.

I think your market is like mine in that no one likes to be nickel and dimed to death. Give them a price and stick to it. But do let them know your costs increased because of this or that, but fortunately, you had some room just such things and can cover it.

8/15/17       #9: Storage charges ...
Alan F. Member

We only charge storage for major delays that are caused by city or owner changes once we have started production.

But for customers that require predetermined labor rates for change orders we list storage costs

Storage Rates $1.25 Per month, per Square Foot, single stack height.

We have always had storage for larger projects and retail roll outs so most of what you describe is built into our overhead.

8/15/17       #10: Storage charges ...
cabmaker

You are trying to run a larger business in a building that is designed for small projects.

If you want to compete in this marketplace you need to either increase your overhead and work out of a larger building or else add storage facilities for your projects and build that into the price.

Two years ago your projects were smaller. Two years from now they may be again. Adding to capacity by leasing storage space is a strategy that is flexible enough to handle either economy.

8/15/17       #11: Storage charges ...
harold morantz

Website: http://morantzcabinets.com

good points all. Thanks. The storage area is another 1K a month and i am getting good prices from this developer and no hassles ever, so i will cosider it part of doing business for now. we are in 3600 sqft and really could use 5.5-6000 sq feet. just got in a new used brandt KDF 530C and it was a job getting it into shop, so will stick with extra storage until i am ready to move to a bigger facility, G-d willing.

8/16/17       #12: Storage charges ...
Charles Member

I really do not see a reason to talk to the customer to let him know the costs are going up because you have to rent storage space. Think of the storage space as an extension to your current building. Yes, it may not be co-located, but hear me out. Would you also feel the need to talk to the customer about rising costs because you moved to a larger building, that included additional storage space on-site? Probably not. I do not see any reason to concern the customer with how you operate your business internally.

The exception, as many have stated, is when the customer needs to have product stored for a looooong period of time and you have already started/completed the project. That would be an above-and-beyond charge consideration.

BTW, for these loooong exceptions, I would ask for full payment of the product when it was completed and stored. To do otherwise means we are essentially "loaning" the customer funds. We are not a bank!

The customer is interested in a) can he get what he wants, b) when he needs it, c) and at an acceptable cost to him. Everything else is not his concern. Set your pricing to be fair to the customer AND to you and keep on selling, building, and delivering. :-)

8/20/17       #13: Storage charges ...
cabinetmaker

We are in 20k feet and grew into it. Then I noticed just junk taking up space.

I bought a used semi trailer and "5 S" the place for unused items. The 3mm edgebanding literally took up 8 wide by 7 tall of valuable space. It went out there.

Now that the semi is completely organized finished small jobs roll out there on carts and we leave an ailse way to move jobs in and out.

We have three box trucks, two trailers . jobs also go right these as complete and inti the yard. As we grow we are looking at semi's to load into and leave in the yard. Road worthy "pups" are cheap as used 24' used uhauls.

Remember to handle as little as possible while keeping your profits intact

8/24/17       #14: Storage charges ...
David Waldmann Member

Website: vermonthardwoods.com

We have an agreement to pay storage charges built into our contract.

It comes into effect if the order is not delivered within 2 weeks of the latter of the original ship date, or actual completion date.

Since we are making flooring, the charge is based on SF. We charge $50/M per month. SF is rounded up to nearest thousand.

We almost never enforce it; it's there for extreme cases, but I think it's good to have it agreed upon before hand. For example we once had an order that was not shipped for over three years. We right now are sitting on one that was done in April of 2016.


Post a Response
  • Notify me of responses to this thread
  • Subscribe to email updates on this Forum
  • To receive email notification of additions to this forum thread,
    enter your name and email address, and then click the
    "Keep Me Posted" button below.

    Please Note: If you have posted a message or response,
    do not submit this request ... you are already signed up
    to receive notification!

    Your Name:
    E-Mail Address:
    Enter the correct numbers into the field below:
     

    Date of your Birth:



    Return to top of page

    Buy & Sell Exchanges | Forums | Galleries | Site Map

    FORUM GUIDELINES: Please review the guidelines below before posting at WOODWEB's Interactive Message Boards (return to top)

  • WOODWEB is a professional industrial woodworking site. Hobbyist and homeowner woodworking questions are inappropriate.
  • Messages should be kept reasonably short and on topic, relating to the focus of the forum. Responses should relate to the original question.
  • A valid email return address must be included with each message.
  • Advertising is inappropriate. The only exceptions are the Classified Ads Exchange, Machinery Exchange, Lumber Exchange, and Job Opportunities and Services Exchange. When posting listings in these areas, review the posting instructions carefully.
  • Subject lines may be edited for length and clarity.
  • "Cross posting" is not permitted. Choose the best forum for your question, and post your question at one forum only.
  • Messages requesting private responses will be removed - Forums are designed to provide information and assistance for all of our visitors. Private response requests are appropriate at WOODWEB's Exchanges and Job Opportunities and Services.
  • Messages that accuse businesses or individuals of alleged negative actions or behavior are inappropriate since WOODWEB is unable to verify or substantiate the claims.
  • Posts with the intent of soliciting answers to surveys are not appropriate. Contact WOODWEB for more information on initiating a survey.
  • Excessive forum participation by an individual upsets the balance of a healthy forum atmosphere. Individuals who excessively post responses containing marginal content will be considered repeat forum abusers.
  • Responses that initiate or support inappropriate and off-topic discussion of general politics detract from the professional woodworking focus of WOODWEB, and will be removed.
  • Participants are encouraged to use their real name when posting. Intentionally using another persons name is prohibited, and posts of this nature will be removed at WOODWEB's discretion.
  • Comments, questions, or criticisms regarding Forum policies should be directed to WOODWEB's Systems Administrator
    (return to top).

    Carefully review your message before clicking on the "Send Message" button - you will not be able to revise the message once it has been sent.

    You will be notified of responses to the message(s) you posted via email. Be sure to enter your email address correctly.

    WOODWEB's forums are a highly regarded resource for professional woodworkers. Messages and responses that are crafted in a professional and civil manner strengthen this resource. Messages that do not reflect a professional tone reduce the value of our forums.

    Messages are inappropriate when their content: is deemed libelous in nature or is based on rumor, fails to meet basic standards of decorum, contains blatant advertising or inappropriate emphasis on self promotion (return to top).

    Libel:   Posts which defame an individual or organization, or employ a tone which can be viewed as malicious in nature. Words, pictures, or cartoons which expose a person or organization to public hatred, shame, disgrace, or ridicule, or induce an ill opinion of a person or organization, are libelous.

    Improper Decorum:   Posts which are profane, inciting, disrespectful or uncivil in tone, or maliciously worded. This also includes the venting of unsubstantiated opinions. Such messages do little to illuminate a given topic, and often have the opposite effect. Constructive criticism is acceptable (return to top).

    Advertising:   The purpose of WOODWEB Forums is to provide answers, not an advertising venue. Companies participating in a Forum discussion should provide specific answers to posted questions. WOODWEB suggests that businesses include an appropriately crafted signature in order to identify their company. A well meaning post that seems to be on-topic but contains a product reference may do your business more harm than good in the Forum environment. Forum users may perceive your references to specific products as unsolicited advertising (spam) and consciously avoid your web site or services. A well-crafted signature is an appropriate way to advertise your services that will not offend potential customers. Signatures should be limited to 4-6 lines, and may contain information that identifies the type of business you're in, your URL and email address (return to top).

    Repeated Forum Abuse: Forum participants who repeatedly fail to follow WOODWEB's Forum Guidelines may encounter difficulty when attempting to post messages.

    There are often situations when the original message asks for opinions: "What is the best widget for my type of shop?". To a certain extent, the person posting the message is responsible for including specific questions within the message. An open ended question (like the one above) invites responses that may read as sales pitches. WOODWEB suggests that companies responding to such a question provide detailed and substantive replies rather than responses that read as a one-sided product promotion. It has been WOODWEB's experience that substantive responses are held in higher regard by our readers (return to top).

    The staff of WOODWEB assume no responsibility for the accuracy, content, or outcome of any posting transmitted at WOODWEB's Message Boards. Participants should undertake the use of machinery, materials and methods discussed at WOODWEB's Message Boards after considerate evaluation, and at their own risk. WOODWEB reserves the right to delete any messages it deems inappropriate. (return to top)


  • Forum Posting Help
    Your Name The name you enter in this field will be the name that appears with your post or response (return to form).
    Your Website Personal or business website links must point to the author's website. Inappropriate links will be removed without notice, and at WOODWEB's sole discretion. WOODWEB reserves the right to delete any messages with links it deems inappropriate. (return to form)
    E-Mail Address Your e-mail address will not be publicly viewable. Forum participants will be able to contact you using a contact link (included with your post) that is substituted for your actual address. You must include a valid email address in this field. (return to form)
    Subject Subject may be edited for length and clarity. Subject lines should provide an indication of the content of your post. (return to form)
    Thread Related Link and Image Guidelines Thread Related Links posted at WOODWEB's Forums and Exchanges should point to locations that provide supporting information for the topic being discussed in the current message thread. The purpose of WOODWEB Forums is to provide answers, not to serve as an advertising venue. A Thread Related Link that directs visitors to an area with inappropriate content will be removed. WOODWEB reserves the right to delete any messages with links or images it deems inappropriate. (return to form)
    Thread Related File Uploads Thread Related Files posted at WOODWEB's Forums and Exchanges should provide supporting information for the topic being discussed in the current message thread. Video Files: acceptable video formats are: .MOV .AVI .WMV .MPEG .MPG .MP4 (Image Upload Tips)   If you encounter any difficulty when uploading video files, E-mail WOODWEB for assistance. The purpose of WOODWEB Forums is to provide answers, not to serve as an advertising venue. A Thread Related File that contains inappropriate content will be removed, and uploaded files that are not directly related to the message thread will be removed. WOODWEB reserves the right to delete any messages with links, files, or images it deems inappropriate. (return to form)